![]() ![]() CEC incorporated innovative stormwater quality best management practices (BMPs) into the site by designing planting strips between each bay of parking, with each functioning as a bioswale to improve water quality while managing stormwater runoff. CEC’s final site plan concept had an equal distribution of parking spaces surrounding the buildings, utilizing terraced parking lots to conform to the existing terrain and allow natural treed buffers to remain, while preserving natural open space. ![]() CEC ApproachĬEC developed a master plan, which included layout, grading, and earthwork studies to determine the feasibility of the proposed 1,000,000+ square foot campus. The topography of the property, with the presence of steep slopes and streams, also played a factor in the design. The goal was to design the site with the buildings centrally located and parking spaces for nearly four thousand employees as to blend into the natural landscape – and with reasonable pedestrian access. The Trammell Crow Company needed site evaluation and master planning services for this project. An 83-acre property located in the Cranberry Woods Business Park, in Cranberry Township, Pennsylvania, was to become the corporate headquarters for Westinghouse Electric Company’s nuclear design division. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |